F25 Senior Engineering Design Project

Timeline
-
September 1, 2025Experience start
-
September 17, 2025Design Proposal
-
October 1, 2025Initial Design
-
October 18, 2025Concept validation
-
November 4, 2025Detailed Design
-
November 22, 2025Initial Pototype
-
December 19, 2025Experience end
Timeline
-
September 1, 2025Experience start
-
September 17, 2025Design Proposal
Broad project description including requirements and constraints and an outline of the proposed solution.
-
October 1, 2025Initial Design
Preliminary analysis and initial paper design,
-
October 18, 2025Concept validation
Prototype of the key components of the proposed design, demonstrating validation of the overall design concept.
-
November 4, 2025Detailed Design
A complete design on paper.
-
November 22, 2025Initial Pototype
A working prototype of the complete design.
-
December 19, 2025Experience end
Experience scope
Categories
Civil engineering Mechanical engineering Electrical engineering Hardware product designSkills
mechanical drawings engineering design process solidworks (cad)Bob Jones University senior engineering students do a solo capstone design project where they design a product or system, from preliminary design to pre-production prototype. These projects are in five areas: aerospace, civil, computer, electrical, and mechanical.
Learners
1. Design report including a detailed design with analysis and simulation results.
2. Design documents (electrical schematics, SolidWorks mechanical drawings, software listings, etc. depending on the project)
3. Typically a prototype device.
As with any academic project, the results are not guaranteed. The quality of the resulting design varies widely from student to student and project to project, but the goal is usually a working pre-production prototype. We work diligently to vet projects and match students to maximize the chance of success.
Project timeline
-
September 1, 2025Experience start
-
September 17, 2025Design Proposal
-
October 1, 2025Initial Design
-
October 18, 2025Concept validation
-
November 4, 2025Detailed Design
-
November 22, 2025Initial Pototype
-
December 19, 2025Experience end
Timeline
-
September 1, 2025Experience start
-
September 17, 2025Design Proposal
Broad project description including requirements and constraints and an outline of the proposed solution.
-
October 1, 2025Initial Design
Preliminary analysis and initial paper design,
-
October 18, 2025Concept validation
Prototype of the key components of the proposed design, demonstrating validation of the overall design concept.
-
November 4, 2025Detailed Design
A complete design on paper.
-
November 22, 2025Initial Pototype
A working prototype of the complete design.
-
December 19, 2025Experience end
Project Examples
Requirements
Recent examples from each discipline:
Electrical: Battery backup aquarium air pump
Mechanical: Ambidextrous school desk design
Computer: GSP-enabled wireless pet collar
Aerospace: airfoil for landing wheel spinup
Civil: Improved bell siphon design
Additional company criteria
Companies must answer the following questions to submit a match request to this experience:
Timeline
-
September 1, 2025Experience start
-
September 17, 2025Design Proposal
-
October 1, 2025Initial Design
-
October 18, 2025Concept validation
-
November 4, 2025Detailed Design
-
November 22, 2025Initial Pototype
-
December 19, 2025Experience end
Timeline
-
September 1, 2025Experience start
-
September 17, 2025Design Proposal
Broad project description including requirements and constraints and an outline of the proposed solution.
-
October 1, 2025Initial Design
Preliminary analysis and initial paper design,
-
October 18, 2025Concept validation
Prototype of the key components of the proposed design, demonstrating validation of the overall design concept.
-
November 4, 2025Detailed Design
A complete design on paper.
-
November 22, 2025Initial Pototype
A working prototype of the complete design.
-
December 19, 2025Experience end